Project background:
This project involves the construction of an early production facility for Bisat Oilfield located at Muscat, Oman. The Bisat was appraised by drilling two horizontal wells revealing oil rates in excess of 1,000 barrels per day of light oil. Bisat is located 35 kilometers north of the production facilities. This is a significant discovery adding to OOCEPÂ’s resource base and providing future growth opportunities. OOCEP is currently finalizing its development plan for first oil production, leveraging on its existing production facilities. The Bisat oil discovery has opened up a new play fairway trend in the western margin of the Oman petroleum basin and could help unlock additional oil resources in the block and vicinity. The client is working in cooperation with Oman Ministry of Oil & Gas and Oman Gas Company on this development. The facility is expected to be completed by 2021-end.
Yes, we have the honor of supplying our products for this great project.
We signed the contract in early 2021. And the main products are:
SOUR SERVICE NACE MR 0175 & ISO 15156
SOURE SERVICE CS PIPING & FORGINGS



Value is in 50K-300K USD.
Something about Longtaidi:
Reliable raw materials and competitive price.
LONGTAIDI is a manufacturer for
1. #Steel #piping, #fittings, #flange
2. #Cladded pipe, fittings, flange (#CRA PIPING) & MLP (#Mechanical Lined Pipes)
3. Pre-#fabrication, piping #spools etc.
Certificate: #API Q1, 5LD, ISO 9001, ISO 14001, ISO 45001, OHSAS 18001, CE/PED, GOST, EAC, #ASME U, #ASME PP certificate,#BV, #ABS, LR, #DNV, CCS, etc certificate.
Approved & Registration: #ADNOC, #KOC, Petrofac, #MODEC, SBM #OFFSHORE, #MCDERMOTT, DAEWOO, SAMSUNG, #EGAS, #SINOPEC, CNOOC, CNPC approved vendor.